North parking lot at Osceola Landing to close for bridge construction

Posted 9/18/26

St. Croix Falls, Wis. — The northernmost parking lot and co-located boat ramps at Osceola Landing will close next week as part of the upcoming Hwy 243 Osceola Bridge replacement project. The …

This item is available in full to subscribers.

Please log in to continue

Log in

North parking lot at Osceola Landing to close for bridge construction

Posted

St. Croix Falls, Wis. — The northernmost parking lot and co-located boat ramps at Osceola Landing will close next week as part of the upcoming Hwy 243 Osceola Bridge replacement project.
The parking lot and boat ramps will be used as a staging area and river access point for construction equipment for the duration of the Hwy 243 bridge replacement project. During this time, the rest of Osceola Landing will be open for visitor use including alternative parking lots, restrooms, picnic shelters, trail, and other river access points.
The bridge replacement project is being managed through partnership between the Minnesota and Wisconsin Departments of Transportation., with more information at https://www.dot.state.mn.us/metro/projects/hwy243osceola/.

About the National Park Service
Established in 1916, the National Park Service preserves America’s most treasured natural and cultural places for the enjoyment, education and inspiration of current and future generations. Learn more at nps.gov.